The control plan is one of the most important documents used to maintain the gains made during the analysis and improve portions of a Six Sigma project. The control plan is a “living” document that is continually updated to capture continuing improvements.
Estimated completion time (hours): 1.0
Objectives
By the end of this course, you will be able to do the following:
- Define the minimum requirements for a control plan
- List sources of information for a control plan
- List required documents based on a control plan
- Define a dynamic control plan
- Six Sigma Green Belt
Estimated Time (Hrs): 1
Language: English