AER-4001: Marking Fastener Locations for Drilling Project
Before holes are drilled in an assembly, their locations must be marked. Estimated completion time (hours): 0.9 By the end of this course, you will be able to do the ...
Estimated Time (Hrs): 0.9
Language: English
AER-4002: Setting Up the Drill Motor
Drilling a quality hole starts with properly aligning the pieces in the assembly and correctly installing a drill bit in the drill motor. Estimated completion time (hours): 0.7  By the end ...
Estimated Time (Hrs): 0.7
Language: English
AER-4003: Drilling Pilot Holes and Enlarging Holes
Pilot holes are typically the first holes drilled in any assembly. They are usually too small to accommodate the shank of any standard fastener, so they must be enlarged before fasteners can be ...
Estimated Time (Hrs): 1.1
Language: English
AER-4004: Deburring
Burrs are raised material left around the edge of a drilled hole. This excess material must be removed, or it may interfere with fastener installation. The process of removing this material is ...
Estimated Time (Hrs): 0.9
Language: English
AER-4005: Driving Protruding head Rivets
This course is a simulated student project that teaches how to install and inspect protruding head rivets in an aircraft assembly or structure. Estimated completion time (hours): 1.1 By the...
Estimated Time (Hrs): 1.1
Language: English
AER-4006: Assembly Preparation for Advanced Fasteners Project
Before fasteners can be installed in this assembly, it must be constructed and holes prepared. Estimated completion time (hours): 1.1 ObjectivesBy the end of this course, you will be able to...
Estimated Time (Hrs): 1.1
Language: English
AER-4007: Installing Nut Plates
A Winslow drill motor is used to create the additional holes needed to fasten nut plates to the assembly. Estimated completion time (hours): 1.0 ObjectivesBy the end of this course, you ...
Estimated Time (Hrs): 1
Language: English
AER-4008: Compression Riveting
Installing rivets with a compression riveter is faster and more consistent than installing rivets with a pneumatic rivet gun. Estimated completion time (hours): 0.8  ObjectivesBy the end of...
Estimated Time (Hrs): 0.8
Language: English
AER-4009: Installing Bolts
Bolts are installed using either manual or pneumatic torque tools. Estimated completion time (hours): 0.7  ObjectivesBy the end of this course, you will be able to do the ...
Estimated Time (Hrs): 0.7
Language: English
AER-4010: Securing Bolts with Lockwire
Lockwire is used to secure bolts and prevent them from loosening. Lockwire can be installed by hand with regular pliers or with lockwire pliers. Estimated completion time (hours): 0....
Estimated Time (Hrs): 0.8
Language: English
AER-4011: Marking Fastener Locations for Countersinking and Flush Riveting Project
Before holes are drilled in an assembly, their locations must be identified and marked. Estimated completion time (hours): 1.0 ObjectivesBy the end of this course, you will be able to do ...
Estimated Time (Hrs): 1
Language: English
AER-4012: Setting Up the Assembly and Drill
The first step when installing a flush head rivet is to select and install the proper drill bit in the drill motor. Estimated completion time (hours): 0.7 ObjectivesBy the end of this ...
Estimated Time (Hrs): 0.7
Language: English
AER-4013: Drilling, Enlarging, and Deburring Holes
Prior to installing fasteners in any assembly, pilot holes must be drilled. Because pilot holes are not large enough to accommodate fasteners, the pilot holes must be enlarged to size. Any burrs...
Estimated Time (Hrs): 1.4
Language: English
AER-4014: Setting the Countersink Tool (project)
Check and adjust the countersink depth by creating several practice countersinks in scrap material of the same composition and thickness as the assembly. Estimated completion time (hours): 1....
Estimated Time (Hrs): 1.4
Language: English
AER-4015: Countersinking (project)
Once you have verified the depth of the countersink cutter in the scrap assembly, you can countersink holes in the final assembly.  Estimated completion time (hours): 0.8 ObjectivesBy the...
Estimated Time (Hrs): 0.8
Language: English
AER-4016: Flush Riveting
After the holes in the assembly are drilled and countersunk, the flush rivets are installed in the assembly. Estimated completion time (hours): 1.3  ObjectivesBy the end of this course, ...
Estimated Time (Hrs): 1.3
Language: English
AER-4017: Assembly Preparation for 90 Degree Drilling Project
Before the fasteners can be installed in this assembly, the assembly must be constructed and the holes prepared. Estimated completion time (hours): 1.6 ObjectivesBy the end of this course,...
Estimated Time (Hrs): 1.6
Language: English
AER-4018: Installing 5/16 Inch Hi-Loks
Hi-Loks are installed using a combination of tools. There are several different tools you can use to install the collar of a Hi-Lok, including manual torque tools and pneumatic torque tools....
Language: English
AER-4019: Installing 3/16 Inch Hi-Loks
Two different size Hi-Loks are required for this assembly: 5/16 inch and 3/16 inch. Estimated completion time (hours): 0.9 ObjectivesBy the end of this course, you will be able to do the ...
Language: English
AER-4020: Installing Protruding Head Rivets
This assembly requires three vertical rows of protruding head rivets. Estimated completion time (hours): 0.8  ObjectivesBy the end of this course, you will be able to do the following: ...
Language: English
AER-4021: Removing Rivets in the 90 Degree Drilling Project
The tools and techniques used to remove rivets differ from those used to install rivets. Estimated completion time (hours): 0.8 ObjectivesBy the end of this course, you will be able to do ...
Language: English
AER-4022: Removing 5/16 Inch Hi-Loks
A specially designed pair of pliers called Hi-Lok collar pliers can be used to remove Hi-Lok collars. These pliers deform the shape of the collar, loosening it from the Hi-Lok shank....
Language: English
AER-4023: Drilling Titanium
To drill a quality hole in titanium material, you need to understand titanium materials and have good basic drilling knowledge and skills.  Estimated completion time (hours): 2....
Estimated Time (Hrs): 2.1
Language: English
AER-4024: Marking Hole Locations for Drilling Titanium
Before holes are drilled in an assembly, their locations must be marked.Estimated completion time (hours): 1.0 ObjectivesBy the end of this course, you will be able to do the following: ...
Estimated Time (Hrs): 1
Language: English
AER-4025: Drilling Pilot Holes in Titanium
In this course, you will be shown how to create the assembly and drill pilot holes. Estimated completion time (hours): 0.9 ObjectivesBy the end of this course, you will be able to do the ...
Estimated Time (Hrs): 0.9
Language: English
AER-4026: Drilling and Enlarging Holes in Row JD2
After the pilot holes are drilled in rows JD1, and JD3 through JD8, drill the pilot holes in row JD2 and then enlarge them. Estimated completion time (hours): 1.1 ObjectivesBy the end ...
Estimated Time (Hrs): 1.1
Language: English
AER-4027: Enlarging Row JD7
The next row of holes to enlarge is row JD7. Estimated completion time (hours): 0.8  ObjectivesBy the end of this course, you will be able to do the following: Enlarge the holes in ...
Estimated Time (Hrs): 0.8
Language: English
AER-4028: Enlarging Rows JD4, JD5, and JD6
After enlarging the holes in row JD7, enlarge the holes in rows JD4, JD5, and JD6. Estimated completion time (hours): 0.8 ObjectivesBy the end of this course, you will be able to do the ...
Estimated Time (Hrs): 0.8
Language: English
AER-4029: Enlarging Rows JD1 and JD3
After enlarging the holes in rows JD4, JD5, JD6, and JD7, enlarge row JD1 and JD3.Estimated completion time (hours): 1.0  ObjectivesBy the end of this course, you will be able to do the ...
Estimated Time (Hrs): 1
Language: English
AER-4030: Enlarging Row JD8
After enlarging the holes in all the other rows in the assembly, enlarge the holes in row JD8. Estimated completion time (hours): 0.8  ObjectivesBy the end of this course, you will be able ...
Estimated Time (Hrs): 0.8
Language: English
AER-4031: Chamfering
Two rows in the final assembly require chamfers: rows JD4 and JD6. Estimated completion time (hours): 1.0  ObjectivesBy the end of this course, you will be able to do the ...
Estimated Time (Hrs): 1
Language: English
AER-4032: Edge Breaking and Deburring
Although no fasteners will be installed in this assembly, it is still important that you learn the final hole finishing procedures required for titanium assemblies. Estimated completion time ...
Estimated Time (Hrs): 1.4
Language: English
AER-4033: Tools for Wing Structure Project
Understanding the types of materials you’ll be working with when assembling the wing of an airplane is important. Wing structures are assembled using thicker materials and a variety of fasteners...
Estimated Time (Hrs): 1.2
Language: English
AER-4034: Preparing the Assembly for the Wing Structure Project
Before installing fasteners, the locations of the holes in the assembly must be marked and pilot holes drilled in many of these locations. Estimated completion time (hours): 1....
Estimated Time (Hrs): 1.4
Language: English
AER-4035: Countersinking and Fillet Relief
Fillet relief and countersinking are required for some of the holes in this assembly. Other holes, require a combination of counterboring and countersinking to accommodate fluid-tight fasteners....
Estimated Time (Hrs): 1.2
Language: English
AER-4036: Installing Fasteners
There are many types of fasteners installed on the wing structure including Hi-Loks, lockbolts, protruding head rivets and fluid-tight rivets. Estimated completion time (hours): 1....
Estimated Time (Hrs): 1.4
Language: English
AER-4037: Preparing the Assembly for the Fuselage Skin Assembly
Preparation of the assembly includes gathering supplies, tools and setting up the project on the assembly jig. Estimated completion time (hours): 1.1  ObjectivesBy the end of this course, ...
Estimated Time (Hrs): 1.1
Language: English
AER-4038: Drilling the Skin Panels
Before you can install fasteners, you’ll need to mark the locations of pilot holes, drill the pilot holes, and then enlarge them to full size.Estimated completion time (hours): 1....
Estimated Time (Hrs): 1.1
Language: English
AER-4039: Preparing the Doubler
Doublers are used to increase the strength of the fuselage assembly. Estimated completion time (hours): 1.0  ObjectivesBy the end of this course, you will be able to do the ...
Estimated Time (Hrs): 1
Language: English
AER-4040: Countersinking
Countersinking is required before installing flush head rivets into the fuselage assembly. Estimated completion time (hours): 0.8  ObjectivesBy the end of this course, you will be able to do...
Estimated Time (Hrs): 0.8